Technofast – Oil and Gas Australia – EziJac – Dec 2021
BOLTED flange joints on connecting pipes, valves, pumps, and other equipment are Integral to flexibility when maintaining piping systems, allowing for easier disassembly
Technofast – NZ Engineering News – Airport – June 2021
Refurbishment of precision adjustment of the Technofast tensioners was simply accomplished by a two-man team using hydraulic power to release, refurbish and replace each of the twin nuts tensioning each cable.
Assembly challenge cuts time and labour input by half – with better safety and bolt integrity. Assembly challenge cuts time and labour input by half – with better safety and bolt integrity.
A two-thirds time saving has been achieved in the installation and maintenance of vibrating screen and crusher motor drives by the use of Technofast EziTite Hydraulic Nuts.
3D printing technology, like that being trialled to enable astronauts to manufacture precision parts in space, is being used for a more down-to-earth application by Technofast Industries.
Technofast – Highway Engineering Australia – Airport – June 2021
Versatile Technofast cable tensioners supporting Sydney Airport’s control tower have delivered a master class in low- maintenance engineering and construction technology after faultlessly withstanding the worst conditions nature could throw at them for 25 years.
Technofast – Energy Source & Distribution – wind towers
A challenge to an Australian manufacturing and engineering company to reduce the assembly times of wind turbine generator couplings has resulted in a halving of the time and labour taken to do the job-and increased safety as well.
Technofast – EcoGeneration – Wind Generators – Oct 2021
A challenge to reduce the assembly times of wind power generator couplings has resulted in a halving of the time and labour taken to do the job, after Australian hydraulic fastening company Technofast Industries was asked by a US operation of a European manufacturer how it could improve its operations.
A CHALLENGE to an Australian manufacturing and engineering company to reduce the assembly times of wind power generator couplings has resulted in a halving of the time and labour taken to do the job-and increased the safety of the job as well.