A challenge to an Australian manufacturing and engineering company to reduce the assembly times of wind turbine generator couplings has resulted in a halving of the time and labour taken to do the job-and increased safety as well.
Australian Technofast Industries was asked by the US arm of a major European manufacturer to improve the efficiency of its operation to help meet growing demand for its products.
“There are now more than 340,000 wind turbines on the planet, generating more than 700GWe of power, and the total is increasing exponentially. So any operation that improves efficiency and safety of production is very welcome and applicable to thousands of applications,” Technofast CEO John Bucknell explains.
Technofast’s challenge was to develop an alternative to older methods of fastening-such as torque wrenches-to cut the assembly time of the shrink disc coupling which joins the turbine to the generator of the design involved.
The coupling consists of tapered components which are fixed using an array of bolts grouped together to make a friction drive designed to be capable of slipping under extreme load to protect the generator from damage in service.
Technofast produced a custom-engineered hydraulic bolt incorporating a flexible base, which allows the unit to absorb movement of the of the flange being bolted during assembly without damage to any part of the system.
“The operation-which is applicable to a wide range of applications in the power industry- used to take eight to 10 hours using two crews of up to eight workers to do a consecutive torque tightening routine,” Bucknell says.
“So we have cut time and labour needs at least in half, while also solving the OHS issues of fatigue from holding up individual wrenches involved in the job. The large crews doing the job the old way needed to swap-out repeatedly because of the weights involved-a problem which has been removed.”
The globally proven safety and labour-saving fasteners are simultaneously actuated to give accurate, even and time-saving torquing across sets of bolts. Releasing of the bolts for servicing is achieved equally simply and simultaneously by releasing the hydraulic pressure used to stretch the bolt to achieve the exact torquing required (rather than twisting the bolts individually to achieve torquing).
“There is also a strong safety and reliability benefit in service in the completed wind tower, because 100 per cent of the bolts incorporated into the wind generators are fastened to exactly the same tensions required. This helps optimise time in operation before service is required, which is obviously a major operation given the heights at which crews are working,” Bucknell says.
To help extend the technology to wider use within the electricity industry, Technofast has introduced a 3D printer service-an exact but far less expensive lightweight plastic example of what interested parties need so they can trial the fitting before committing to any order of multiple fasteners made from high-strength metal.