Projects

CS-02 Coal Mine

Site
BMA open cut coal mine (Bowen Basin)
Application
Drag drum pedestal bolting
Original Set-Up
Four 2” UNC bolts tightened with flogging spanner
Issues Experienced
  • No Control of bolt load
  • Difficult location 
  • OH&S issues with the use of flogging Spanner
Technofast Product Used

Standard 2” commercial grade EziTite hydraulic nuts (EZI-CI200UL)

Benefits
  • Easy installation and handling
  • Removed the need for flogging spanner improving OH&S
  • Precise bolt load achieved
Installation Time

Old Method = 50 minutes (1-2 personnel)
New Method = 12 minutes (1 personnel)
Time Saving = 38 minutes

FM233- CS02 Coal Mine
quote icon

Many improvements to Steel Products

Definitely a safety advantage. By using tensioning products we are continually reducing the need for heavy manual handling

Mechanical Planner

Innovation solutions for your industry.

Technofast Industries is an worldwide leader and specialist in Bolt Tensioning, providing innovative and effective technical solutions along with uncomprising customer service.