Projects

CS-03 Gold Mine

Site
Boddington Gold Mine
Application
Newmont Gearbox Couplers on Polysius—Polycom PM8-24/17M
Original Set-Up
Installation was performed with two Hydraulic Bolt Tensioners which required multiple passes of the bolts (40 in total) Removal was then carried out with the use of a Hydraulic Torque wrench
Issues Experienced
  • Extremely time consuming
  • Difficult and confined location
  • inconsistent bolt loads
  • OH&S issues with the use of hydraulic torque wrench
Technofast Product Used

Special M48 x 3.0 Ultra High Tensile EziTite® Hydraulic Nuts linked together

Benefits
  • Easy installation and handling
  • installation and removal is by the same method
  • Precise bolt load achieved
  • improved installation and removal times dramatically
Installation Time

Old Method = 10-12 hours (6 personnel)
New Method = 3 hours (3 personnel)
Time Saving = 7 hours minimum

CS-03 Gold Mine
quote icon

Many improvements to Steel Products

The Technofast team designed a special nut to achieve required size. The ease of fitting and the tensioning has reduced the overall time by two thirds and manning from 6 to 3. The implementation of this setup has allowed us to reach the timelines required for shutdowns on these Machines

Project Manager

Innovation solutions for your industry.

Technofast Industries is an worldwide leader and specialist in Bolt Tensioning, providing innovative and effective technical solutions along with uncomprising customer service.